We recently visited the construction site for Acciona's new Kelvin Power Station, a significant development in modern energy infrastructure.
Our task involved sandblasting the new rib deck soffit, meticulously removing the existing coating to prepare the surface for subsequent painting by other contractors.
This essential preparatory work ensures the highest standards of surface integrity, contributing to the overall durability and longevity of the power station's structural components.
We sand blasted over 17,000m2 of rib deck over several weeks for the client.